Boiler Inspection and Repair Projects

  • POWER GENERATION PLANT

    Boiler Repair following tube rupture

    Radiant Superheater Replacement of 25 full boiler tubes

    High-Temperature Superheater Replacement of 35 full tubes

  • GREEN POWER GENERATION FACILITY

    Trash Burning Boiler Maintenance

    Boiler Grate Maintenance

    Replace Worn Grate Components During Plant Outage

    Replace Trash Ram into Furnace

    25 Tube Partial Replacements

    Process Piping, ASME Welding Repair During Plant Outage

  • POWER GENERATION FACILITY

    Unit#4, Boiler Outage Tube Sectional Replacement of 28 Tubes

    Replaced Due to Hydrogen Embrittlement Found During Inspection of Original Tube Replacement

    One Section of 1.5" Reheat Section of Boiler

    100% Weld Acceptance

  • REFINERY

    Replaced Cogen Economizer Header

    125 Tube Connection Welds

    Prefabricated Economizer Header