Install foundation and containment
Placement of the main primary transformer
Install substation control house
Install structural steel and dead-end structure ( “H” & A-frame )
Construction Management, Built Blast Resistant Module for Operations Shelter
Built Concrete Foundation, 60” X 50”, 4 Feet Deep
Set Four Blast Resistant Module, 52,000 Pounds Each
Supervised Sewer Connections Supervised Electrical Power and Data Connection
Conduit in Trenches and Overhead in Cable Trays 96 Strand Fiber Optic Cables
•24 Strand Data Cables
•Supervised Domestic Water Connection
Client 50 mW site builds (3)
Client 100 mW site builds (3)
Client 200 / 400 mW site builds (2)
Client 300 / 600 mW site builds (3)
Client Substation & Interconnects builds
Line 71/79
Project Scope, designed two 12” carbon steel lines to provide flexibility between two local facilities AND main distribution line
160 caissons throughout an existing storage tank facility
Estimated and tracked man hours and costs to complete the project
Developed an accurate projected schedule including coordinating tie ins with multiple operating unit outages.
Constructability analysis
Under Alloy Project and High Yield Crude and Vacuum Unit Upgrade
Managed two projects in one operating unit
Replaced main crude unit process piping
Replaced vacuum vessel and associated process piping
Scheduled 75% of construction completed pre turnaround
Scrubber Installation Project
125-Foot-tall fiberglass scrubber unit• Structural steel support structure, stairways and walkways to the top
Fiberglass and steel piping systems
Demolished an existing 200-foot-tall existing scrubber, steel construction